Log Cabin
Installation Manual
GARDEN log cabinS WESSEX INSTALLATION
MANUAL - THE SHERBOURNE
3.2M(W) x2.6M(L) x 2.57M(H)
Click
here for full printable manual with diagrams.
The key
to successful installation is a good, perfectly level base.
Spending time on this will help you put the log cabin up and
ensure it lasts for a long time.
RECOMMENDED BASE PREPARATION
It is essential that your log cabin be erected on to a firm,
level base and far enough away (24 - 30cm) from any walls
to allow for any overhang.
METHOD 1 - Paving Slab Base
You should remove any vegetation from the area. Lay the slabs
on to sand or ballast to the minimum base size required (as
above). Use a spirit level to ensure that the slabs are completely
level. This
method is not suitable if your log cabin is sited on a sloped
area.
METHOD 2 - Concrete Base
You should remove any vegetation from the area. Lay approximately
5cm of hardcore on to which you should lay approximately
5cm of concrete to the base size required. Using a spirit
level ensure that
the base is completely level. A good way to ensure that the
base is square is to measure both diagonals (corner to corner).
The measurements will be the same if your base is square.
If the base is uneven you will find an increased difficulty
in installing your log cabin and you may encounter problems
at a later date. If the base is not level and you have opted
to have your
garden log cabin erected, we regret that we cannot do so until
a suitable base is laid, and a revisit fee will be incurred.
PLANNING
PERMISSION & LOG CABIN REGULATIONS
Planning permission is not generally required as the Wessex
Range of garden log cabins are classed as “Portable
log cabins”,
however, the interpretations of planning requirements varies
with different local authorities. Ultimately your local planning
authority (local planning authority usually means your District
or Borough Council) decides whether or not planning permission
is required. If you are in any doubt as to whether or not
planning permission should be obtained you should contact
your local planning authority. Examples of cases where planning
permission may need to be obtained are as follows:
Your log cabin is being erected in the grounds of
a listed log cabin, a conservation area or green belt land.
• Your
log cabin exceeds 30m ² floor area (none
of the standard Wessex Log Cabins exceed this).
• Your log cabin will stand taller than 4 metres once
erected (none of the standard Wessex Log Cabins exceed
this).
• Your log cabin will cover more than 50% or more of
the grounds in which it is to be erected.
The information
given here is just a guide, and not a definitive list of
all situations where planning permission may need to be obtained.
If you have access to the internet then you may find the
website www.planningportal.gov.uk useful. The interpretation
of log cabin regulations may also vary from area to area.
We believe that the Standard Wessex Log Cabin Range complies
with log cabin regulations, however if your log cabin is for
public or business use you should contact your local authority
for further advice. We do not accept liability in any cases
where a Wessex Garden Log Cabin has been erected without the
necessary planning permission or where the necessary log cabin
regulation rules have not been followed.
LAYERING THE WALLS: STORAGE AFTER DELIVERY
If you are not going to start the installation of your garden
log cabin immediately it is very important that the components
are stored carefully. The materials should be stacked horizontally,
and be protected from weather conditions such as humidity
and the sun. Please note that for health & safety reasons
we advise that at least two people assemble this log cabin.
SPECIFICATION
Min. Base Size Required 3M(W) x 3M(L)
Packed weight 800kg
Overall roof size 3.64M x 3.88M
Approximate pitch angle 18°
Log Thickness 28mm
Thickness of Roof/Floor Boards 19mm
TOOLS REQUIRED:
SPIRIT LEVEL - To ensure that your base and walls are level.
HAMMER & MALLET - To knock logs together with the aid
of a knocking block, which is provided inside the pack and
for roof & floor board installation.
TAPE MEASURE- Use when checking off logs and to ensure that
the correct lengths of logs are being used when installing
your log cabin.
STEPLADDER- Needed when installing the roof boards and felting.
SAW- To trim down roof & floor boards.
SCREWDRIVER- Required at various stages throughout installation.
DRILL - You will need a 8mm wood drill bit to secure storm
braces.
GETTING STARTED
Please ensure that the logs are covered
or stored inside prior to assembly as the machining is extremely
precise in order for them to interlock properly and it may
become difficult to fit the logs correctly if the boards
do become wet and swell. Ensure that your base is level with
a spirit level and to the right measurements required. Using
the specification checklists, sort the logs out, placing
them on the side of the base they will be needed so that
you have everything you need to hand once you start log cabin
the walls. By laying the logs out in this way you won’t
have to hunt for each log and this will ultimately save you
time! Don’t place the logs directly on grass or a muddy
surface as it will be very difficult to clean them afterwards!
It is important to remember that the door and window can
be installed on either side of your log cabin and with the
door at the front or rear end. It is important to decide
how you wish to position them before you start installation.
YOU WILL NEED TO:
• Check all your components are present*
• Check all your bits and pieces are present*
• Make sure you have all tools to hand
• Make sure you have all installation manuals and
diagrams*
*When you receive your garden log cabin,
you will receive a technical specification with it. On this
copy there will be a control number for your log cabin, please
quote this number if you find you have any parts missing
or if you have problems with your log cabin.
1. LAYING THE FOUNDATION BEAMS
The foundation beams AR1 & AR2 should be placed on
the ground in accordance with the Foundation drawing.
They should be laid with the 60mm edge facing down
to the base. Check that the foundation beams are level
by using a spirit level. Nail the foundation beams
together using the 120mm nails.
Once you have installed your foundation beams check
that your log cabin is square, by measuring the diagonal
lengths with a tape measure. If the two
diagonals are exactly the same then the
log cabin should be square. If not, you
need to adjust the foundation beams
until they are square and the diagonals
are the same.
2.
LAYING THE FIRST LAYER OF LOGS
Lay one half log 001 on to the foundation beam at the
rear of your log cabin and the other 001 log onto the
foundation beam at the front. This will overhang the
foundation beams by approximately 5mm on each side.
Then, lay one 011 log on both sides of the log cabin.
Interlock the side logs with the front and rear half logs.
Make sure that the logs are sitting squarely on the
foundation beams by using a spirit level and screw
down the half logs to the foundation by using the
70mm screws in each log.
3. LAYERING THE WALLS
1. Take two of the 008 logs and position them on top of
the half log at the front of your log cabin correctly, either
side of where the door will be and interlock them with
the side logs. Place the hitting block provided inside the
pack over the logs, and using a mallet or hammer,
gently knock them into place taking care not to damage
the groove of the log.
2. Take one 002 log and position it on top of the half log
at the rear of your log cabin. Using the same procedure as
above, gently knock the log into place.
3. Take two 011 logs and place one on each side of the
log cabin on top of the 011 logs already in place. Gently
knock the logs into place.
4. Repeat steps 1-3 three times.
4. FITTING THE DOOR
Fit the door fittings to the front door. Take the complete
door together with the frame to your log cabin and position
the doors and frame over the half log in the space at the
front of your log cabin.
To prevent excessive
movement of the doors,
fix the frame to the
bottom half log with one
or two screws. Do not
screw the door frame
down firmly until the
log cabin is complete in
order to allow you to
make final adjustments.
5. BUILD THE WALLS TO FIT THE WINDOW
Once you have positioned the door, continue log cabin the
walls. Follow the steps before until you have laid the 7th
layer of full sized logs. Then:
1. Take two of the 009 logs and position them at either side
at the front of your log cabin correctly and take two 010
logs and position either side of the door. Gently knock
into place, taking care not to damage the groove of the
log, as before.
2. Take one 002 log and position on top of the other 002
logs at the rear of your log cabin. Again gently knock into
place.
3. Take two of the 012 logs and position them at either side
of where the window will be placed on the non-blank side
of the log cabin. Again gently knock them into place.
4.Take one 011 logs and place on the blank side of the
log cabin on top of the 011 logs already in place. Gently
knock into place.
Repeat 3 more times until you have laid 10 layers of logs.
6. FITTING THE WINDOW
Fit the window fittings to the windows. The windows are
supplied with a frame and the whole section should be
placed over the log in the gaps for the windows.
7.
FINISHING THE WALLS
Continue to fit the logs as per section 5 with the exception
that at the front of the building, you will need to slot in the
010 logs between the windows and the door. Continue to
build the walls up to the top of the windows. For the front
and rear walls, fit he last two 002 logs and the 013, 014,
015 & 016 logs to the side walls as per the drawings to
complete the walls up to the eaves.
8. INSTALLING THE GABLES
Gable sections (Apex) can be fitted once the walls have been
completed. They interlock into the side walls.
9. ENSURING
YOUR LOG CABIN IS SQUARE
Now is the time to recheck that your log cabin is square.
Using a spirit level, check each wall of your log cabin is
vertical and recheck the diagonal lengths of the log cabin
to ensure they are the same. Adjust the log cabin accordingly
until it is square. Once the roof has been installed this
will lock your log cabin into position and it will be very
difficult to adjust the position of your log cabin. If you
find that your log cabin is not square you will be more likely
to incur later problems with your doors and window sticking
etc.
10. INSTALLING THE PURLINS (Rafters)
Taking the ridge purlin PR1, (this is the purlin that has
a slight ridge down the length) and put into position at
the apex of your log cabin. The notches in the purlin should
sit inside the notches in the gable. Using the mallet and
hitting block, make sure that the purlin is tightly in
position. Follow the same procedure for fitting the re-maining
two purlins PR2. Using a spirit level check that the sides,
front and rear of your log cabin are vertical.
11. FITTING
THE ROOF BOARDING
Once the purlins are in place you can begin fitting the
roof boarding 070. The roof boards should be only slightly
tapped together. Fix the roof boards to each purlin using
the 2.5 x 50mm nails provided. Once the roof boarding is
complete fit the roof edge reinforcement slats 080 along
the underneath of the length of the boards to hold them in
place firmly.
12. FELTING THE ROOF
Once the roof boarding is complete you should felt your log cabin.
Cut the felt provided into lengths that match the full
length of your roof. Fix the lengths of felt; starting
from the lowest edges of your roof, using either roofing
felt nails or staples. Make sure that you leave an overhang
of approximately 10cm on the sides so that you can nail
or staple the felt to the roof edge reinforcement slats.
If you have opted for a shingle roof then please read the
attached shingle installation guide.
13. FINISHING THE ROOF
Once felted you will need to add the finish-ing pieces to
the roof of your log cabin. Fix the wind brace 110 to the
fascia boards (100) and then fix over the felt in line
with the top of your roof. The eave edging 090 is fitted
over the felt at the sides of the log cabin. To finish,
fit the diamonds 120 to the apex of your log cabin at the
front and rear of your log cabin.
14. FITTING THE FLOOR
We recommend that you protect the floor boards from muddy
footprints. The floorboards should be fitted as the roof
boards and slightly tapped together( to allow for movement).
Fix the floorboards with the 2.5 x 50mm nails provided.
Fit the floor beading 130 around the edges of the log cabin,
using the brass coloured nails provided.
15. FITTING THE
STORM BRACES
You will now need to fit the storm braces (140). The storm
braces are fitted against the inside of the interlocking
wings on the front and rear corners of your log cabin. The
storm braces will help to stabilise your log cabin in the
event of high winds, although they do not make your log cabin
immune to storm damage! Each of the braces has an oblong
shaped slot cut into one end. This is the bottom of the storm
brace. Drill into the bottom of your log cabin and attach
the brace, using the bolts, nuts and washers provided. Only
use your fingers to tighten this end of the brace. Drill
into the top of your log cabin and attach the brace, again
using the bolts, nuts and washers provided. This end of the
brace can be
tightened using a spanner. Ensure that the top of the brace
is approximately 25 – 35mm below the roof boards.
HANDY HINTS
Throughout installation you should
continually check that the Garden log cabin is completely
square and level. This
will eliminate later problems with the doors and window sticking.
To help achieve this it is essential that your base
is completely firm and level. If your foundation beams are
just 5mm out of square, your door frames will eventually
twist as the log cabin tries to squares itself.
A quick and
simple way to ensure that the foundation beams are completely
square is to measure across the diagonals. Both diagonals
should measure the same distance. If they do not then you
must adjust the foundation beams accordingly to ensure
that they are the same.
Ensure throughout installation that
the walls of your log cabin are square both horizontally and
vertically.
If your apex appears to be higher than the walls
of your log cabin then this means that the
logs are not slotted into position correctly. To ensure that
they are correctly in position, use
the knocking block to knock the ends of the logs into place
as per the drawing:
TREATING YOUR GARDEN LOG CABIN
Once you have
erected your Wessex Garden Log Cabin, it is important to
maintain it correctly. If treated and maintained correctly
you should enjoy your Wessex Garden Log Cabin for many years.
Apart from the floor joists, the log cabin is supplied
completely untreated. It is strongly recommended that
you treat your garden log cabin within 14 days of
installation. When treating your log cabin, please bear
in mind that colours may appear slightly different due
to the individual qualities of timber.
When applying treatment to your Garden Log Cabin, it is
important that you stipple it into the corners and log
slots as this will help prevent moisture from seeping in.
When choosing your treatment ensure that it is suitable
for use on planed wood, and not for sawn timber. For
more information on our range of treatments, please
contact our sales team on 01362 822434.
AFTERCARE
APPEARANCE OF GAPS
Timber is a natural product and will vary
with changes in humidity and temperature. When the weather
becomes extremely dry, small cracks may appear between the
boards. These cracks will disappear when the weather normalizes.
Small cracks that are formed after a long drought period
cannot be avoided, however, they do not affect the static
load bearing capacity of the Wessex Garden Log Cabin.
If gaps begin to appear between the boards then it is
possible that the storm braces have been fitted too tightly.
The first thing to do in this case is to loosen off the
bolts of
the storm braces to see if this allows the log cabin to settle
back into position.
If problems persist with gaps appearing between logs and
loosening the storm braces does not resolve the problem,
place a block of wood into the ends of the logs and using
a
mallet, hit them back into place gently. (See handy hints)
Gaps will also appear between the boards if you restrict
the
movement of the boards in anyway. We strongly advise
against installing any fixtures that will restrict the
movement of the log cabin.
OTHER PROBLEMS
Roofing felt is liable to
some movement with changes of temperature that can sometimes
result in a rippling effect. This is perfectly normal and
will not reduce the quality of the roofing felt.
Doors & Windows will expand and contract with changes
in humidity and temperature. To minimise the risk of any
problems occurring, ensure that all of the windows are treated
using an appropriate product. It may be necessary to
adjust the screws holding the units in place from time to
time.
|